Tonight I cemented.
Not my teeth — I haven’t gone the false way yet!
Instead, the basement demanded help. I have inserted some new duct work under a two foot section of the floor.
The cement instructions require that not too much water is added. Otherwise you decrease the strength of the cement and length the curing time. I carefully measured in some water and added a bit more (sort of like cooking!!). Then I trowelled in the mixture, filling in all the cracks. I left the final topping just a few centimeters short of the floor surface. I’ll add a final mixture of fine cement to level the floor.
Now, on to the next project — finishing off the basement decor.